Modernisation of Warszawa-Lodz railway line Modernization of E-65 railway line
Feasibility Study for modernization of CE 59 Railway Line Miedzylesie Wroclaw - Kostrzyn - Szczecin Work supervision of the modernization of the E-20 railway line sect. Minsk  Mazowiecki -Siedlce
Design documentation  of reconstruction of Tram Depot in Gdansk, Wita Stwosza street 110 Modernisation of the Poznan Node
Railway viaduct for the A-2 highway (WK-5 structure) St.Roch bridge's reconstruction
Modernisation of the  tram depot in Poznan , Glogowska street Modernisation of the tram service station  Podgorze in Cracov
Modernization of E30 Railway Line Section Opole - Wroclaw - Legnica Transmission equipment  of  DWDM optical platform  and overlay network SDH - STM 16





 
                Platform apporoach adapted for the disabled                               New road viaduct modernized track lay-out.
       on passaenger stop & siding in Dabrowa Niemodlinska              and traction network on the section Osetnica-Okmiany.

Modernization of E30 Railway Line
Section Opole – Wroclaw – Legnica – the State border

Aim of the project: complex modernization and adaptation of line E30 on section Opole - Wroclaw - Legnica - the State border to AGC /AGTC standards taking into account intermodal and combined transportation as well as elimination of some operation „bottle necks” in the international transportation corridor which E30 Railway Line is a part of (Corridor III Berlin/Drezden – Wroclaw – Opole – Krakow – Kiev). Final effect of the project is improvement of railway infrastructure condition and shortening travelling time by 240 minutes.

Section Opole – Brzeg – Olawa – Wroclaw (82 km)

Role of BPK Poznan Sp. z o.o. – performing the role of General Designer including technical coordination of pre-design works and design documentation prepared by other design companies and taking part in the process of working out multi-trade design documentation at all stages of the process, i.e construction designs, detailed designs and tender dossier, including gaining building permit for complex rebuilding works on the section in order to repair damages coused by the flood, taking into account AGC/AGTC standards and requirements of combined transportation industry as well as intermodal transportation.
Modernization works included:

●  Rebuilding of stations: Opole Zachodnie, Dabrowa Niemodlinska (turning into a passenger stop), Lipki (turning into a passenger stop), Olawa, Izawice (turning into a passenger stop),
●  Rebuilding of passenger stops: Chroscina, Przecza, Zebice Wroclawskie,
●  Modernization of railway routes,
●  Rebuilding of engineering objects present on the line.

The range of rebuilding works included geometrical layout, substructure, superstructure with drainage; railway crossings, traction network, non – traction lines and station signalling equipment; buildings, instalations and electric and communication equipment.
Modernization of stations included rebuilding platforms, tunnels and other transportation routes, devices for visual and acoustic passenger information, landscaping elements including facilities for the disabled

Section Wroclaw Muchobor – Legnica- length 55,8 km

Role of BPK Poznan: Coordination and working out a multi-branch design documentation at all stages of preparation, i.e. construction and detailed designs and tender dossier including receiving building permit ; also modernization in order to adapt entire railway infrastructure to speed 160 km/h for passenger trains and 100 –120 km/h for freight trains.
Documentation for section Wroclaw – Legnica has been prepared in cooperation with BPK Katowice Sp. z o.o., Elekol S.C. (at present Arcadis Profil Sp. zo.o.) BPK i UI Lodz, Gibb Polska Sp. zo.o. (at present Jacobs GIBB Polska Sp. z o.o.) , CBPBBK ”Kolprojekt”, BPI Sp. o.o. (at present Pöyry Infra Sp. z o.o.).
Rebuilding concerned the following:
Stations:
●  Wroclaw Zerniki,
●  Wroclaw Lesnica,
●  Miekinia,
●  Sroda Slaska,
●  Malczyce,
●  Szczedrzykowice.
Railway Routes:
●  Wroclaw Muchobor – Wroclaw Zerniki,
●  Wroclaw Zerniki –  Wroclaw Lesnica,
●  Wroclaw Lesnica – Miekinia (z p.o. Mrozow),
●  Miekinia – Sroda Slaska ( z p.o. Przedmoscie Sw.),
●  Sroda Slaska - Malczyce,
●  Malczyce – Szczedrzykowice,
●  Szczedrzykowice –Legnica (z p.o. Jaskowice Legnickie i p.odg. Wielkie Piekary)
Engineering objects:
●  10 viaducts,
●  10 bridges,
●  56 ducts,
●  7 underpasses.
30 level crossings including:
●  crossings of category A –   11
●  crossings of category B -   3,
●  crossings of category C -   7,
●  crossings of category D -   9.

In order to reach modernization goals the rebuilding of following objects has been designed:

●  Track layouts including replacement of substructure, breakstone, beds, tracks, turnouts;
●  Exterior networks and installations, sanitary and industrial equipment;
●  Level crossings with concepts of road traffic around the liquidated crossings;
●  Traction network with supporting constructions;
●  Electric equipment including power supply devices for railway objects and other objects, outer ilumination of stations and stops, power supply and illumination of turnouts, electric heating of turnouts, emergency power supply for signalling devices;
●  Signalling devices with replacement and installation of semaphores in new locations, building new automatic line blockade and introduction on section Wroclaw – Legnica computer signalling equipment from one signal box;
●  Also increasing power of traction substations in order to allow electric locomotives of power of 6000 kilowats;

Stations were equipped with new 200 m long platforms, adapted for disabled persons.
Landscaping has been done and colour elevation of buildings.