Modernisation of Warszawa-Lodz railway line Modernization of E-65 railway line
Feasibility Study for modernization of CE 59 Railway Line Miedzylesie Wroclaw - Kostrzyn - Szczecin Work supervision of the modernization of the E-20 railway line sect. Minsk  Mazowiecki -Siedlce
Design documentation  of reconstruction of Tram Depot in Gdansk, Wita Stwosza street 110 Modernisation of the Poznan Node
Railway viaduct for the A-2 highway (WK-5 structure) St.Roch bridge's reconstruction
Modernisation of the  tram depot in Poznan , Glogowska street Modernisation of the tram service station  Podgorze in Cracov
Modernization of E30 Railway Line Section Opole - Wroclaw - Legnica Transmission equipment  of  DWDM optical platform  and overlay network SDH - STM 16





 
                        Ilowo station                                                                                            Nasielsk station
level -crossing keeper's house-present state                                                           
Present state

 

 

 Project co-financed by European Union funds 

Desing documentation and tender dossier for the project 
''Modernization of line E65 - Section Warszawa - Gdynia, stage 1 in Poland"

Railway line E65 Warszawa - Gdansk - Gdynia together with the section Katowice - Zwardon- Zilina is a part of the 6th Pan-European Transportation Corridor which is the shortest way through the Middle Europe between the Baltic Sea region and Balcan Region and the Adriatic Sea. This line belongs to the European agreement concerning major international railway lines ( AGC) and also the agreement of major international lines for combined transportation and sites (AGTC)

The range of design work includes program and spacial concept, building and detailed designs as well as tender dossier to select a contractor for complex modernization work, namely rebuilding the track layers on stations and open lines, such as: superstructure with correcting track geometry, substructure, drainage, signalling equipment at stations, lines and level-crossings; telecommunication equipment and network together with the passenger information, contact network with 3 kV power supply elements, non-traction network; railway electrical power network and devices of SN and nn; liquidation and modernization of level crossings together with building by-passes, new viaducts and underpasses; modernization of existing engineering constructions, traffic conducting buildings, platforms and landscape architecture; constructions of environment protection; removing obstacles of remaining elements of non-railway infrastructure and industrial and sanitary installation. 

Expected main results of modernization of the line are as follows
1) Preparation of technical infrastructure of the line for performance parameters defined in the AGC and AGTC 
     agreements, namely speed of the passenger trains with classical rolling-stock to 160 km/h and fright trains to 
     120 km/h and axel load 225 kN;
2) Adapting the line to rolling-stock with inclined body with maximum speed 200 km/h;
3) increasing security on single level-crossings and through building new double level -crossings;
4) Improvement of protection of the environment;
5) Increasing travel security comfort and shortening time of travel, increasing competitiveness of the railway

Documentation worked out by Consortium comprising of:

I. LCC Nasielsk, LCC Ciechanów: section from km 4,254 (Warszawa Wschodnia) to km 131,100 Ilowo) 
   1. Centralne Biuro Projektowo Badawcze Budownictwa Kolejowego "Kolprojekt''
       settled in Warszawa - Leader of the Consortium
    2. Biuro Projektów Komunikacyjnych in Poznan Sp. z o.o 
    3. Biuro Projektów Kolejowych i Uslug Inwestycyjnych Sp. z o.o. settled in Lodz 
    4. JacobsGIBB(Polska) Sp. z o.o. settled in Warszawa 

II. LCC Dzialdowo: section from km 131,100 (Iłowo) - to km 184,800 (Montowo)         

   1. Biuro Projektów Komunikacyjnych w Poznaniu Sp. z o.o -     Leader of the Consortium

   2. Centralne Biuro Projektowo Badawcze Budownictwa Kolejowego ''Kolprojekt" 
        settled in Warszawa
   3. Biuro Projektów Kolejowych i Usług Inwestycyjnych Sp. z o.o settled in ŁódĽ 
   4. JacobsGIBB(Polska) Sp. z o.o. z siedzib± w Warszawie 

III. LCC Gdansk LCC Gdynia: from km 315 (Pruszcz Gdanski) to km 328,120 (Gdansk Glowny) and from km 0,000 (Gdansk Glowny) to km 26,172 (Gdynia Chylonia) 
As for LCC Dzialdowo 

 

 