Modernisation of Warszawa-Lodz railway line Modernisation of E-65 railway line
Feasibility study for the modernisation of the E-59 railway line Work supervision of the modernisation of the E-20 railway line sect. Minsk  Mazowiecki -Siedlce
Transmission equipment  of  DWDM optical platform  and overlay network SDH - STM 16 Modernisation of the Poznan Node
Railway viaduct for the A-2 highway (WK-5 structure) St.Roch bridge's reconstruction
Modernisation of the  tram depot in Poznan , Glogowska street Modernisation of the tram service station  Podgorze in Cracov
 





 

                 Project co-financed by ISPA funds

Poznan Railway Node is a significant part of the E-20 railway line. It is located in the territory of seven stations: from Swarzędz station in the East to Poznan-Junikowo station in the West and covers the area of 20 km. The main station is Poznan Glowny, where intersect E-20 and E-59 railway lines.The later (the North – South route) links to the international E-30 railway line (Dresden–Ukraine)

Poznan Glowny station

 General project objectives

Present bad condition of the geometry of track lay – outs and the pavement in the Node do not allow to operate trains over 80 km/h. For this reason, there have been established the following objectives and effects  which should be obtained:

1. besides the speed increase – modernisation of traffic controlling devices on the entry and the exit from the node for more efficient controlling of traffic in the whole node area;

2. the priority is safety and reliability as well as uninterrupted traffic flow in the whole Poznan Node;

3. modernised track layout will enable stopping on additional lines on stations without necessity to occupy the running lines;

4. increase in safety on level crossings due to decreasing their number and the equipping the remaining level crossings with modern signalling and “visual supervision“;

5. increasing of safety due to construction of two- level crossings;

6. increased capacity of the E-20 railway line after completion of works and train operation using modern 6 MW locomotives; 

7.  improvement of transport quality and cutting the journey time through the capacity increase in the node;

8. maintaining the current functions of the station with the possibility of increasing quantitative parameters of the transportation offer;

9. cutting of costs of railway transport and rationalisation of infrastructure use on the section Swarzedz–Junikowo;

10. improvement of transport offer and consequently increase of the number of clients through: 

     a.  improvement of travel comfort,

     b. reduction of travel time,

     c. increase of railway competitiveness (speed and punctuality).

11. reduction of maintenance and labour costsh: 

12.  crucial element of the project is the improvement of environmental conditions within the
    construction area

After the modernisation the E-20 railway line is supposed to become the main line within Poznan Node improving the connections between the EU countries and the countries of Eastern Europe.

 


Home page


ul. Kosciuszki 68, 61-891 Poznan
tel.  (0-61) 85-88-711, 85-88-720, 85-88-700
fax  (0-61) 85-88-712, 62-31-550
e-mail: bpk@bpk-poznan.com.pl