| |

The Railway Traffic Control Team prepares design documentations
at all
stages of elaboration in the scope of:
- station , key , mechanical ,
electrical of various types ,hybrid ( relay and computer
)and
computer railway traffic control systems ;
- manual blocks and automatic electric block systems (of various
types and modifications)
on open tracks;
- traffic safety systems on level crossings mechanically or remotely
operated;
semi-automatic and automatic ones (of various types
and modifications)
- remote control systems within junctions and railway lines
together with
main and local
control centers;
- diagnostic equipment for railway traffic control systems;
- equipment for diagnosing of rolling stock failures;
- CCTV systems for control of train rear section signals and for
observation of traffic on
railway level crossings with remote operation of level
crossing equipment;
- automatic train stopping devices.
Home page
|
|